CORE reviewed and accepted (core/docs/adr-0011-core-response.md,
lane/core@7bf5cb5), with three amendments folded in:
- yield (slot transfer at the next segment boundary) as the mechanism
that satisfies min-1-before-seconds out of a full budget; steal
stays slot-neutral as originally written.
- "admission implies progress" is bounded-delay
(min(next yield boundary, low_speed_secs) + connect_timeout), not
immediate — widens the starvation-assertion window from 2s to
~low_speed_secs + connect_timeout (45s).
- starved_tasks()/starved_since(TaskId) added to the accessor set;
segments_active() and tasks_starved definitions pinned (a
'connecting' segment counts as held, not starved).
All five open questions answered (min-1 buildable without inversion,
probe pool size 4 outside the budget, drain-not-kill live-apply,
ordered TaskId list for priority, 4Hz + starved-edge callback
coalescing). Section 6 rewritten: connection.maxActiveSegments landed
on the wire in PROTO's ADR 0012 while this was in flight, so the
daemon-local stopgap is dropped.
daemon/src/sched/ is unblocked. Both docs updated in the rebased
vdm-daemon worktree against the frozen 1.0.0 contract.
Co-Authored-By: Claude Sonnet 5 <[email protected]>
Claude-Session: https://claude.ai/code/session_01Upd9WhG9oppieig5nRDLig
Settles the open interface question in AGENT-DAEMON.md before sched/ is
written: DAEMON's concurrency governor (global/per-queue/per-host, task
units) and CORE's maxActiveSegments (segment units) are two governors on
two axes with non-overlapping enforcement — each lane enforces exactly
the ceilings counted in the units it owns, with one narrow task-unit
clamp against maxActiveSegments. Records the fairness rule DAEMON needs
from CORE (min-1-before-seconds) so admission implies progress even
when one download could otherwise hold the entire segment budget.
Companion daemon/docs/core-requests-m1.md is the concrete engine API
ask (budget()/segments_active()/on_budget_changed, live-apply semantics
for set_max_active_segments, set_host_segment_cap, probe pool sizing)
plus one contract gap for PROTO (connection.maxActiveSegments missing
from Settings.schema.json).
Status: proposed, pending CORE sign-off on the five open items at the
end of the ADR. daemon/src/sched/ does not land until that lands.
Co-Authored-By: Claude Sonnet 5 <[email protected]>
Claude-Session: https://claude.ai/code/session_01Upd9WhG9oppieig5nRDLig